|
CIVIL INFRASTRUCTURE -
Highways Freeways & Roads
This commission comprised design and documentation of a new major link road of 2.4 kilometres single carriageway joining Servetus Street, Swanbourne, with West Coast Highway, City Beach, adjacent to the SAS Rifle Range and Cottesloe Golf Club. Client: Main Roads of Western Australia.
Reid
Highway Ludlow Bypass Road and three bridges - Vasse, Western Australia. This project in the South West Region of Western Australia involved the design and documentation for 18 kilometres of dual carriageway to form portion of the Bunbury to Augusta main route. Three bridges over the Sabine, Abba and Ludlow Rivers were also designed and documented. Client: Main Roads Western Australia. Northern City Bypass (Graham Farmer Tunnel). Airey Taylor Consulting was commissioned by Main Roads Western Australia and the East Perth Redevelopment Authority to determine the final route through the East Perth Precinct to link the Hamilton Interchange of the Mitchell Freeway to Great Eastern Highway, Perth. The project involved alternate routes and horizontal profiles with differing interchange configurations. Traffic studies and environmental assessment were also performed. Kwinana Freeway Stage 6. 12 kilometres of limited access dual carriage way, including the ultimate Kwinana Freeway geometrics, drainage, five grade separated interchanges, dual use paths and noise bunds. The design of this first stage construction for the Main Roads Western Australia comprised integrated at-grade intersections, landscaping and street lighting to suit the ultimate design. Graham Farmer Bypass Tunnel: Airey Taylor Consulting was invited by the Thiess Transfield Consortium to provide tender design for costing on this $200 million project comprising 1.7kms of tunnel through inner city areas. The tunnel design comprised topside down construction with diaphragm walls and pile anchored floor, with post tensioned and reinforced roof. The approach interchange incorporated two traffic bridges which were super elevated and geometrically curved cloverleaf design. Also included were pedestrian underpass and pedestrian bridge over the tunnel approach lanes. This advanced design was intended for a "build and maintain" contract.
High Street, Fremantle: A reconstruction of portion of High Street between Montreal Street and Stirling Highway, including accommodation works, which was commissioned by the City of Fremantle. George Street, East Fremantle: A road and landscaping project which was commissioned by the Town of East Fremantle. Gidgegannup / Toodyay Highway Upgrade: This project involved the design and documentation for 5kms of single carriageway of the Midland to Goomalling road and drainage near Woorooloo Brook, approximately 40kms north east of Perth. Client: Main Roads Western Australia. This Web Site is best viewed
at 800x600 how do I do that click
here. |