|
WATER RESOURCES - Waste
Water Treatment
Airey Taylor Consulting is
associated with Montgomery Watson Australia Pty Ltd for some water resources
and environmental engineering projects. Brian Stone who is a Senior
Consultant with Montgomery Watson is based in Perth at our West Perth
office. Montgomery Watson is a world leader in water and wastewater
engineering, having designed over 200 major plants world-wide, and offer
program management services for metropolitan wastewater systems.
Montgomery Watson also offer software programs and support services for
hydraulic networks analysis (H20NET) plus a range of services related to
water quality analyses, hazardous waste remediation and environmental
issues.
|
The
Anstey Hill Water Treatment Plant (right)
was designed by Montgomery Watson. The plant is located 20km north
east of Adelaide, South Australia and has a capacity of 315 ML/d.
The Anstey Hill Water Treatment Plant project won an Institution of
Engineers Australia award, due in part to the strong integration of
architectural aesthetics with functional civil engineering design.
Neerabup Stage 1
Water Treatment Plant.
In association with Montgomery Waston (Australia)
Pty Ltd, Airey Taylor Consulting prepared alternative designs for
Water Corporation (WA) for the Neerabup Water Treatment Plant.
The alternative
design featured a 120ML/d filtration plant and included clarifiers,
six flow split filters, back wash system (including wash water
recovery) chemical feeding system and a treated water pumping
station. The alternative design features were acceptable to the
Water Corporation but the proposal was not successful. The design
did however confirm that Montgomery Watson Australia and Airey Taylor Consulting can produce a viable water treatment plant design under
limited time restrictions.
|
 |
|
Bibra Lake Main Sewer, Hydraulic Model:
Airey Taylor Consulting prepared a detailed analysis of flow
monitoring data and calibration of the Bibra Lake and Spearwood Main
Sewers for the Water Corporation using an Extran Hydraulic Computer
modeling package. The sewer system, consisting of sewer pipes of up
to 2.25m. in diameter, was modeled to determine the impact on flow
rates, retention time and storage characteristics of a
multi-pressure mains discharge into a twenty kilometre long sewer
system.
Mount Tom Price Town and Mines Water Supply:
Airey Taylor Consulting fully
designed the water supply system for this North-West company town
and mine.
|
 |
WATER RESOURCE MANAGEMENT
Strong environmental awareness within Airey Taylor Consulting has encouraged the incorporation of environmental and
ecological features into civil engineering design wherever possible.
In water resource management projects, special attention is paid to
design aspects such as drainage systems to enhance the environment
whilst minimising construction costs. This expertise has led to the
commissioning of Airey Taylor Consulting for the following projects:
Westonbirt Arboretum –
Bridgetown (left):
This unique development, currently under
construction, offers joint ownership of 135 hectares
of parklands, exotic trees and shrubs, native flora
and fauna reserves, within an integrated country
village setting and facilities.
|
Kwinana
Freeway Extension: This
section of freeway between Forrest Road and Thomas Road, Spearwood,
incorporated design features like storm water drainage systems and nutrient stripping basins. This design system has also been used in the creation of
artificial wetlands, and has special significance in environmentally
sensitive projects where replenishment of existing wetlands is a major
priority.
Back
Home
This Web Site is best viewed
at 800x600 how do I do that click
here.
Copyright 2000 Airey Taylor Consulting All rights reserved.
Site Designed by Clue Design
|